Post Offer Free
Wuxi Huadong Industrial Electrical Furnace Co.,Ltd.  

Gold Index: 2779

You are here: home  > Alloy Copper Plate Strip Casting Machine Slab Continuous Two Strand

Alloy Copper Plate Strip Casting Machine Slab Continuous Two Strand 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: BSC

 
Alloy Copper Plate Strip Casting Machine Slab Continuous Two Strand
<span style="font-size

 

Alloy Copper Plate Strip Casting Machine Slab Continuous Two Strand


 
.SPECIFICATIONS 
1. Types of casting specifications
* Production variety: copper base alloy (cupronickel) billet coils
 
2. Specification of finished-product coil

  2.1 Number of billets: 2 strips

  2.2 Billet width: 380mm-500mm

  2.3 Billet thickness: 16- 20mm

  2.4 Inside diameter of coil: minimum Φ 600- 800mm

  2.5 Outside diameter of coil: maximum Φ1800mm

  2.6  Maximum weight of coil: max: 6000kg

 

3. Guarantee value of billet thickness difference

  3.1 Transverse thickness difference of billet: 0.75mm—0.3 (After mould modification)

  3.2 Longitudinal thickness difference of billet: <0.3mm (After mould modification)

  3.3 Average energy consumption for smelting by smelting furnace: 250-380kwht

  3.4 Average energy consumption for temperature preservation by holding furnace: 50-80kwh/t

  3.5 Maximum pushing and drawing force: 50KN

  3.6 Pushing and drawing speed range: 1.5-70mm/ sec

  3.7 Average maximum casting speed: 300mm min

  3.8 Maximum shearing force of hydraulic shear: 600KN

  3.9 Coiling speed of coiler: 750mmmin

 

. COPPER CONTINUOUS CASTING MACHINE PROCESS PARTS LIST

No. Equipment Name Unit QTY
1 Line frequency induction smelting furnace (including melting groove and lining building material) set 1
2 Iron core, water jacket and coil of smelting furnace set 1
3 Tundish set 1
4 Line frequency induction holding furnace (including melting groove and lining building material) set 1
5 Iron core, water jacket and coil of holding furnace set 1
6 mould for lining building set 1
7 crystallizer set 2
8 graphite mould set 1
9 Sealing steel mould of crystallizer set 1
10 Dummy bar (made of stainless steel) set 1
11 Dummy plate set 1
12 Cooling water distribution device for crystallizer set 1
13 Secondary cooling device set 1
14 Withdrawal machine set 1
15 Hydraulic follow-up shearing machine set 1
16 Coreless coiler set 2
17 Water-cooled cable for smelting furnace set 1
18 Hydraulic system Complete set 1
19 Electrical control system Complete set 1
20 Regulating transformer (no-load, stepped) for smelting furnace set 1
21 Regulating transformer (no-load, stepped) for holding furnace set 1
22 Gas protection device set 1
23 Surface temperature thermometer set 1
24 Special tools for machine unit    

 
.PROCESS 

     Burdening (Returns should be baled) → Smelting furnace → Chemical analysis → Heating up the sealed launder → Crystallizer → Primary cooling → Secondary cooling → Withdrawal machine → Shearing machine →Coiler

    Select the raw materials according to process document, determine the feeding procedure according to melting points of metallic elements, furnace burden proportions, and difficulty of oxidation burning losses, and charge the raw material into the smelting furnace; When smelting, add certain thickness of covering agent into the furnace, which shall be supplemented in-time; When the molten copper inside the furnace reaches tapping temperature, lab-test the composition of molten copper inside the furnace; Before tapping, completely clean out the clinkers in molten copper; After the tapping of each furnace, keep around 800 kg molten copper inside the furnace, as the starting block. Transfer the molten copper (molten and well-adjusted in the melting chamber) through the sealed launder into the holding furnace, control the temperature of molten copper, keep the molten copper inside the holding furnace at the casting temperature and at certain level range. Under the action of level, the molten copper flows into the crystallizer, and get crystallized into plate-type copper billet through primary cooling by crystallizer. Under the continuous drawing by withdrawal machine, the plate billet of required shape is formed. Secondary cooling system is installed at plate billet outlet, and the flow rate of cooling water is adjustable. The main purpose for adopting these control measures is to ensure crystallization temperature as well as stabilization of process parameters, so as to ensure product quality. The withdrawal of strip billet is realized by means of the dragger, and the time of drawing, stop and reverse pushing by the dragger is continuously adjustable. The optimal control parameter should be determined and timely adjusted according to different materials, different specifications and surface quality conditions. The drawing is controlled by PLC program, realizing cyclical actions of drawing, stop, and reverse pushing.

 

bigPhoto
 Mr. Mrs. Angel Zhang

Tel: 86-510-83788308
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Wuxi Huadong Industrial Electrical Furnace Co.,Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Wuxi
Province/State: Jiangsu
Country/Region: China (Mainland)

You May Like:

Product (55)